Together with ACS, Evans and our design partners have designed two large diesel engine test stands and a mechanical support building . Besides the standard structural and architectural design, Evans also provided the design of two large concrete seismic mass foundations positioned on a vibration isolation spring system. The multi-million dollar test stand building will be completed by the end of 2012. Currently, Evans is also constructing the main test cell building for MTU/Detroit Diesel.